Outdoor Education Pavilion
Washington Elementary School: Cougars Play Outside!
When Kaniksu Land Trust reached out to us to partner on another local project, we were super excited! The first project we worked on together was the Pine Street Woods Pavilion and it brought us so much joy that we couldn’t wait to get started on another project. This time, we were asked to build a pavilion for Washington Elementary School in Sandpoint, Idaho.
Washington Elementary School has an Outdoor Education program where kids get an extra 1-2 hours of outdoor time every week! They use this time to play, learn, and explore nature. Over the past few years, they had been using a large canvas tent as their “home base”. But over the past year, their PTA worked to raise $20K and the school gathered other generous donations, so they had enough funds to invest in a timber frame pavilion as the new gathering place for this program.
KLT has been partnering with Washington for years on their common goal of getting kids outdoors. KLT reached out to us in March 2025 with this project. They first requested a rectangular pavilion, but eventually it was agreed that a 24’x24’ pavilion would better meet the school’s needs, as it would hold a group of children better. We provided several rounds of CAD drawings and then coordinated engineering stamps and approved structural calculations.
The pavilion was designed with traditional mortise and tenon, hidden metal connections, and oak pegs. The design included three Doug Fir King Post trusses with common rafters in-between. Because this pavilion was not attached to an existing structure, special care had to be taken to adjust for wind "lift" and stability. All the knee braces were fully inset 1.5" with 4" tenons, meaning the whole end of the knee brace is pocketed into the timber plus a smaller pocket for the tenon, to provide substantial lateral support. The trusses were built with offset steel-bearing plates and metal tension rods as long as 44". All of these metal components were hidden on purpose. The pavilion was finished off with a "smooth" finish and timber oil to preserve a clean and lasting look. These design elements worked together to create a natural feel that matched the school’s “back to nature” strategy, while also meeting safety and engineering requirements.
After over a year of planning, we were finally able to get building in July 2026. Our shop crew spent over 200 hours making sure each cut and connection fit perfectly so it could be easily assembled on site. The project was eventually installed at Washington Elementary by a local contractor, with support from our team along the way. One of the most fun surprises during this process was that our daughter now attends this school so it became even more special for us to be involved!
This project was the result of many people working together, and we are grateful to be part of the team that helped make this project happen. We can’t wait to see the kids loving their new outdoor space!
Special thanks to: Principal Tassia Hamer, Kaniksu Land Trust, Washington Elementary PTA, Lake Concrete, Stimpson Miller Foundation, Taylor Homecraft, Idagon, and every individual who contributed, supported this project, and believed in the power of Outdoor Education.
Finished project photos coming soon!
What We Did
CAD Drawings
Coordinated Engineering Stamps and Stuctural Calculations
Built Timber Frame Pavilion